An estimate is a range and its assumptions

confidence: mediumupdated: 2026-11-25status: activeengineeringestimationplanning

Claim#

Known work, unknown work and coordination have different uncertainty. A point estimate hides it.

Test#

List the three buckets. Give a range. Name the risk that doubles it.

Proof#

A range a planner can use.

Failure modes#

An estimate without assumptions is a guess.