Berildocs GitHub

Memory cards

Growth needs a hiring bar and a ramp plan

confidence: mediumupdated: 2026-11-25status: activeteam-scalinggrowthhiring

Claim#

Every hire raises or lowers the bar. The ramp plan names the first deliverable and the reviewer.

Test#

Read the last three hires' ramp plans. Check the first deliverable date.

Proof#

A new hire shipping inside the ramp window.

Failure modes#

A hire without a ramp adds load to the team. A lowered bar is permanent.